CHEO, eastern Ontario’s children’s hospital in Ottawa, said its water supply and air conditioning were disrupted after a water main was severed during construction near the hospital’s front entrance early Tuesday afternoon.
CHEO issued a “code grey” at 12:30 p.m. Those are initiated “following the loss of a critical system,” according to a standard alert system.
Ottawa Fire Services were on site providing assistance and supplying bottled water, according to a spokesperson for the city.
In a news release issued later in the afternoon, the hospital confirmed its access to water for clinical care, cooling, drinking water and restroom facilities had been disrupted.
According to Tammy Giovanni, CHEO’s senior vice-president of clinical services and chief nurse, air conditioning has since been restored to the entire hospital.
Giovanni said the hospital enacted a predetermined water conservation plan that prompted CHEO to send non-essential staff home, and cancel elective surgeries and clinical visits.
Flooding at CHEO due to water maine break. <a href=”https://twitter.com/ottawacity?ref_src=twsrc%5Etfw”>@ottawacity</a> <a href=”https://t.co/GhWPyxva05″>pic.twitter.com/GhWPyxva05</a>
—@Davethetrainman
Videos posted online shortly after noon show water gushing from a pipe next to an excavator.
Photos taken around 3 p.m. appeared to show water was no longer flowing from the severed pipe, and photos taken around 4 p.m. showed repairs underway.
The construction was part of a $370-million project to build an integrated treatment centre and parking garage. The water main was struck while construction crews dug to build the parking garage.
EllisDon is the construction contractor at the scene, while the firm Aquatech confirmed they’d been called in to help with the cleanup.
Giovanni said the public should assume the hospital is otherwise operating normally, and CHEO will directly contact any families whose appointments will be affected.
The hospital said it expects work underway to repair the water main will be finished tonight.